Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0182 # 07 Y:1985 | 07 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,516 | $2,500 | Implemented |
UD0182 # 06 Y:1985 | 06 | 1985 | MINIMIZE WATER USAGE | $38,577 | $4,000 | Implemented |
UD0182 # 05 Y:1985 | 05 | 1985 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $2,860 | $1,300 | Not Implemented |
UD0182 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,277 | $50,700 | Not Implemented |
UD0182 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $8,435 | $1,100 | Implemented |
UD0182 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,436 | $0 | Implemented |
UD0182 # 01 Y:1985 | 01 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $153,020 | $24,416 | Implemented |
UD0175 # 01 Y:1985 | 01 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $25,286 | $48,000 | Implemented |
PV0005 # 02 Y:1985 | 02 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,834 | $0 | Not Implemented |
UD0172 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $546 | $0 | Implemented |
UD0172 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,195 | $123 | Implemented |
UD0172 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,225 | $50 | Implemented |
UD0172 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,203 | $150 | Implemented |
PV0006 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $85 | $0 | Not Implemented |
PV0006 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $175 | $0 | Not Implemented |
PV0005 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $437 | $17 | Not Implemented |
OK0179 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $215 | $248 | Implemented |
OK0179 # 03 Y:1985 | 03 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $12,890 | $4,700 | Implemented |
OK0179 # 02 Y:1985 | 02 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $271 | $600 | Implemented |
OK0179 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $1,296 | $3,847 | Not Implemented |
GT0248 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $722 | $581 | Implemented |
GT0248 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,990 | $12,500 | Not Implemented |
GT0248 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $97,891 | $0 | Implemented |
GT0248 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,875 | $500 | Implemented |
GT0248 # 04 Y:1985 | 04 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,830 | $7,000 | Not Implemented |