IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0068 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $6,568 $0 Implemented
NV0068 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $202 $460 Not Implemented
NV0068 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $121 $100 Implemented
NV0068 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,203 $200 Implemented
NV0068 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,439 $1,505 Implemented
NV0068 # 06 Y:1996 06 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $12,310 $850 Not Implemented
NV0068 # 07 Y:1996 07 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $240,000 $600,000 Implemented
NV0068 # 08 Y:1996 08 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,350 $15,000 Implemented
BD0071 # 08 Y:1996 08 1996 RECOVER AND REUSE COOLING WATER $5,820 $4,500 Not Implemented
BD0071 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,364 $14,830 Not Implemented
BD0071 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,243 $7,000 Not Implemented
BD0071 # 04 Y:1996 04 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,753 $3,689 Not Implemented
BD0071 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $3,099 $1,500 Not Implemented
BD0071 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $506 $500 Not Implemented
BD0071 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $1,610 $975 Not Implemented
BD0071 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $459 $1,178 Not Implemented
UF0159 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,087 $20,164 Implemented
UF0159 # 06 Y:1996 06 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,469 $7,000 Not Implemented
UF0159 # 05 Y:1996 05 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $3,227 $0 Not Implemented
UF0159 # 04 Y:1996 04 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,700 $0 Not Implemented
UF0159 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,236 $1,350 Implemented
UF0159 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $163 $389 Implemented
OR0273 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $947 $5,575 Not Implemented
OR0273 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $803 $1,775 Implemented
OR0273 # 02 Y:1996 02 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,544 $1,000 Implemented