Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0382 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,860 | $2,000 | Implemented |
AM0382 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,030 | $0 | Implemented |
AM0382 # 04 Y:2000 | 04 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,440 | $780 | Not Implemented |
AM0382 # 05 Y:2000 | 05 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,020 | $5,500 | Implemented |
AM0382 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $390 | $180 | Not Implemented |
AM0382 # 01 Y:2000 | 01 | 2000 | OPTIMIZE PLANT POWER FACTOR | $10,200 | $11,290 | Not Implemented |
BD0173 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,742 | $600 | Implemented |
BD0173 # 10 Y:2000 | 10 | 2000 | CLEAR AND RENT EXISTING SPACE | $382,956 | $150,000 | Implemented |
BD0173 # 09 Y:2000 | 09 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,980 | $500 | Not Implemented |
BD0173 # 08 Y:2000 | 08 | 2000 | MINIMIZE WATER USAGE | $2,833 | $3,300 | Not Implemented |
BD0173 # 07 Y:2000 | 07 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $664 | $750 | Not Implemented |
BD0173 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $805 | $660 | Not Implemented |
BD0173 # 05 Y:2000 | 05 | 2000 | INSTALL OCCUPANCY SENSORS | $1,220 | $1,050 | Not Implemented |
BD0173 # 04 Y:2000 | 04 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,576 | $10,000 | Not Implemented |
BD0173 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,471 | $1,000 | Not Implemented |
BD0173 # 01 Y:2000 | 01 | 2000 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $31,116 | $16,000 | n/a |
AS0290 # 10 Y:2000 | 10 | 2000 | INSTALL BACK-UP EQUIPMENT | $103,995 | $14,000 | Not Implemented |
AS0290 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,680 | $3,360 | Implemented |
AS0290 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $643 | $180 | Not Implemented |
AS0290 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,040 | $120 | Implemented |
AS0290 # 04 Y:2000 | 04 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $815 | $450 | Not Implemented |
AS0290 # 05 Y:2000 | 05 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,296 | $6,000 | Not Implemented |
AS0290 # 06 Y:2000 | 06 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,134 | $2,590 | Implemented |
AS0290 # 07 Y:2000 | 07 | 2000 | USE SYNTHETIC LUBRICANT | $2,736 | $1,585 | Implemented |
AS0290 # 08 Y:2000 | 08 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,262 | $120 | Not Implemented |