IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0266 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,049 $1,100 Implemented
TT0266 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,458 $6,147 Implemented
TT0266 # 03 Y:2022 03 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,496 $2,400 Implemented
TT0266 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,120 $138,300 Not Implemented
TT0266 # 01 Y:2022 01 2022 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $32,000 $3,900 Implemented
TT0150 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $891 $275 Not Implemented
TT0150 # 06 Y:2015 06 2015 DISCONNECT BALLASTS $1,276 $120 Not Implemented
TT0150 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,475 $3,500 Not Implemented
TT0150 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,597 $63 Not Implemented
TT0150 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,515 $3,000 Not Implemented
TT0150 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $13,344 $10,000 Not Implemented
TT0150 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $19,615 $36,000 Not Implemented
TN0554 # 07 Y:1995 07 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,046 $0 Not Implemented
TN0554 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,625 $0 Implemented
TN0554 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $431 $990 Not Implemented
TN0554 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $343 $820 Not Implemented
TN0554 # 03 Y:1995 03 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,379 $3,800 Implemented
TN0554 # 02 Y:1995 02 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,636 $680 Implemented
TN0554 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $5,277 $19,760 Not Implemented
TN0248 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,966 $375 Implemented
TN0248 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $500 Implemented
TN0248 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $967 $0 Implemented
TN0248 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $354 $399 Not Implemented
TN0248 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,044 $750 Implemented
TN0248 # 03 Y:1985 03 1985 COVER OPEN TANKS $1,628 $800 Implemented