IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,512

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0027 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,642 $900 Not Implemented
MZ0027 # 02 Y:2008 02 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $514 $1,400 Not Implemented
MZ0027 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $1,400 Not Implemented
MZ0027 # 04 Y:2008 04 2008 USE OPTIMUM THICKNESS INSULATION $76 $300 Not Implemented
MZ0027 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,444 $30,600 Not Implemented
MZ0027 # 06 Y:2008 06 2008 HEAT WATER WITH EXHAUST HEAT $9,936 $10,000 Not Implemented
MZ0022 # 01 Y:2008 01 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,425 $2,800 Implemented
MZ0022 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $900 Implemented
MZ0022 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $11,853 $5,458 Implemented
MZ0022 # 04 Y:2008 04 2008 ELIMINATE/REDUCE AN OPERATION $41,408 $0 Implemented
NC0377 # 01 Y:2008 01 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,484 $2,800 Implemented
NC0377 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,040 $1,000 Implemented
NC0377 # 03 Y:2008 03 2008 DEVELOP A REPAIR/REPLACE POLICY $475 $930 Implemented
NC0377 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $5,415 $11,000 Not Implemented
NC0377 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $100 Implemented
NC0377 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,040 $111,342 Implemented
NC0377 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,691 $1,495 Implemented
GT0839 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,317 $5,346 Implemented
GT0839 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,858 $49,525 Implemented
GT0839 # 03 Y:2007 03 2007 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $4,603 $5,050 Not Implemented
GT0839 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,992 $1,000 Implemented
GT0839 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,582 $0 Implemented
TA0119 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $14,150 $25,000 Implemented
TA0119 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,785 $385 Implemented
TA0119 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $0 Implemented