IAC logo
IAC Assessment: UD0815
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0815
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2010
Principal Product sheet metal products
NAICS 332313 - Plate Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 35,000
Annual Production 39,724 Units
Production Hrs. Annual 4,769
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,194 282,360 kWh $0.11
Natural Gas $22,849 2,169 MMBtu $10.53
TOTAL ENERGY COSTS $54,043
RECOMMENDED SAVINGS* $18,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,713
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,258
Cost:
-
- - $2,258 16 - - -
-
kWh
$2,258
16
kW-months/year
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$103
Cost:
-
$68 1,090 $35 1 - - $68
1,090
kWh
$35
1
kW-months/year
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$243
Cost:
$507
$163 2,623 $80 1 - - $163
2,623
kWh
$80
1
kW-months/year
-
-
MMBtu
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$423
Cost:
$200
$284 4,577 $139 1 - - $284
4,577
kWh
$139
1
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,129
Cost:
$2,452
$2,772 47,678 $1,357 10 - - $2,772
47,678
kWh
$1,357
10
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$660
Cost:
$763
$443 7,152 $217 2 - - $443
7,152
kWh
$217
2
kW-months/year
-
-
MMBtu
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$344
Cost:
$1,572
$344 5,555 - - - - $344
5,555
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$88
Cost:
-
$59 951 $29 1 - - $59
951
kWh
$29
1
kW-months/year
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$21
Cost:
-
$14 227 $7 1 - - $14
227
kWh
$7
1
kW-months/year
-
-
MMBtu
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$238
Cost:
-
$238 3,840 - - - - $238
3,840
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,159
Cost:
$1,678
- - - - $4,159 395 -
-
kWh
-
-
kW-months/year
$4,159
395
MMBtu
12: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$190
Cost:
$300
- - - - $190 18 -
-
kWh
-
-
kW-months/year
$190
18
MMBtu
13: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$6,124
Cost:
$50,000
- - - - $6,124 581 -
-
kWh
-
-
kW-months/year
$6,124
581
MMBtu
TOTAL RECOMMENDED Savings:
$18,980
Cost:
$57,472
$4,385 73,693 $4,122 33 $10,473 994 $4,385
73,693
kWh
$4,122
33
kW-months/year
$10,473
994
MMBtu
TOTAL IMPLEMENTED Savings:
$2,713
Cost:
$507
$304 4,891 $2,409 20 - - $304
4,891
kWh
$2,409
20
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas