IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2213 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $45,075 $458,134 Implemented
UL2213 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,500 $0 Not Implemented
UL2213 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $562 Implemented
UL2213 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,339 $0 Not Implemented
UL2213 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $124 $564 Implemented
UL2213 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,734 $1,440 Implemented
UL2213 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $447 $0 Not Implemented
UL2213 # 07 Y:2022 07 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,277 $10,869 Not Implemented
UK1507 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $570 Not Implemented
UK1507 # 19 Y:2015 19 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,614 $3,000 Not Implemented
UK1507 # 18 Y:2015 18 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,118 $996 Not Implemented
UK1507 # 17 Y:2015 17 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,283 $4,078 Not Implemented
UK1507 # 16 Y:2015 16 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,962 $7,200 Not Implemented
UK1507 # 15 Y:2015 15 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,875 $1,500 Not Implemented
UK1507 # 14 Y:2015 14 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $354 $0 Not Implemented
UK1507 # 13 Y:2015 13 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $660 $0 Implemented
UK1507 # 12 Y:2015 12 2015 DEVELOP A REPAIR/REPLACE POLICY $3,131 $1,576 Not Implemented
UK1507 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $573 $420 Not Implemented
UK1507 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $1,822 $2,818 Not Implemented
UK1507 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,894 $18,750 Implemented
UK1507 # 03 Y:2015 03 2015 USE PHOTOCELL CONTROLS $988 $480 Not Implemented
UK1507 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $285 $262 Not Implemented
UK1507 # 05 Y:2015 05 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,784 $18,960 Implemented
UK1507 # 06 Y:2015 06 2015 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,546 $0 Not Implemented
UK1507 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $6,513 $7,500 Implemented