IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0377 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,691 $1,495 Implemented
NC0377 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $100 Implemented
NC0377 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $5,415 $11,000 Not Implemented
NC0377 # 03 Y:2008 03 2008 DEVELOP A REPAIR/REPLACE POLICY $475 $930 Implemented
NC0377 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,040 $1,000 Implemented
NC0377 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,040 $111,342 Implemented
NC0377 # 01 Y:2008 01 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,484 $2,800 Implemented
NC0268 # 01 Y:2003 01 2003 AUTOMATE FINISHING PROCESS $29,974 $26,350 Not Implemented
NC0268 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $9,563 $8,000 Not Implemented
NC0268 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $162 $329 Not Implemented
NC0268 # 03 Y:2003 03 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,491 $2,000 Not Implemented
NC0268 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $693 $500 Implemented
NC0268 # 06 Y:2003 06 2003 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $1,012 $300 Not Implemented
AT0123 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $972 $600 Implemented
AT0123 # 06 Y:1989 06 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $709 $0 Not Implemented
AT0123 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $392 $600 Implemented
AT0123 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,183 $1,000 Implemented
AT0123 # 02 Y:1989 02 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,033 $6,000 Implemented
AT0123 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,117 $1,131 Implemented
AT0123 # 07 Y:1989 07 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $454 $257 Implemented
AT0123 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,075 $0 Implemented
AT0063 # 06 Y:1987 06 1987 INSTALL AUTOMATIC STACK DAMPER $346 $800 Not Implemented
AT0063 # 05 Y:1987 05 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $763 $500 Implemented
AT0063 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $716 $300 Implemented
AT0063 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,247 $3,793 Implemented