IAC Assessment: NC0377
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0377
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2008
Principal Product Cabinets for switchgear
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 290
Plant Area (Sq.Ft.) 128,000
Annual Production 3,000 Pieces
Production Hrs. Annual 4,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,042 5,248,043 kWh $0.03
Electricity Demand $45,964 11,910 kW-months/year $3.86
Electricity Fees $14,287 - $ -
Natural Gas $238,696 24,124 MMBtu $9.89
TOTAL ENERGY COSTS $481,989
RECOMMENDED SAVINGS* $37,740 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,325
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$1,484
Cost:
$2,800
- - - - $1,484 150 -
-
kWh
-
-
kW-months/year
$1,484
150
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,040
Cost:
$1,000
- - $2,040 200 - - -
-
kWh
$2,040
200
kW-months/year
-
-
MMBtu
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$475
Cost:
$930
$302 8,616 $173 23 - - $302
8,616
kWh
$173
23
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,415
Cost:
$11,000
- - - - $5,415 548 -
-
kWh
-
-
kW-months/year
$5,415
548
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$595
Cost:
$100
$392 11,190 $203 27 - - $392
11,190
kWh
$203
27
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,040
Cost:
$111,342
$16,165 461,852 $9,875 1,308 - - $16,165
461,852
kWh
$9,875
1,308
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,691
Cost:
$1,495
$914 26,112 $777 103 - - $914
26,112
kWh
$777
103
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$37,740
Cost:
$128,667
$17,773 507,770 $13,068 1,661 $6,899 698 $17,773
507,770
kWh
$13,068
1,661
kW-months/year
$6,899
698
MMBtu
TOTAL IMPLEMENTED Savings:
$32,325
Cost:
$117,667
$17,773 507,770 $13,068 1,661 $1,484 150 $17,773
507,770
kWh
$13,068
1,661
kW-months/year
$1,484
150
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas