Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
26
matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0266 # 05 Y:2022 | 05 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,049 | $1,100 | Implemented |
TT0266 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,458 | $6,147 | Implemented |
TT0266 # 03 Y:2022 | 03 | 2022 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,496 | $2,400 | Implemented |
TT0266 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,120 | $138,300 | Not Implemented |
TT0266 # 01 Y:2022 | 01 | 2022 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $32,000 | $3,900 | Implemented |
TT0150 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $891 | $275 | Not Implemented |
TT0150 # 06 Y:2015 | 06 | 2015 | DISCONNECT BALLASTS | $1,276 | $120 | Not Implemented |
TT0150 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,475 | $3,500 | Not Implemented |
TT0150 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,597 | $63 | Not Implemented |
TT0150 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,515 | $3,000 | Not Implemented |
TT0150 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,344 | $10,000 | Not Implemented |
TT0150 # 01 Y:2015 | 01 | 2015 | OPTIMIZE PLANT POWER FACTOR | $19,615 | $36,000 | Not Implemented |
TN0554 # 07 Y:1995 | 07 | 1995 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $1,046 | $0 | Not Implemented |
TN0554 # 06 Y:1995 | 06 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,625 | $0 | Implemented |
TN0554 # 05 Y:1995 | 05 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $431 | $990 | Not Implemented |
TN0554 # 04 Y:1995 | 04 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $343 | $820 | Not Implemented |
TN0554 # 03 Y:1995 | 03 | 1995 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,379 | $3,800 | Implemented |
TN0554 # 02 Y:1995 | 02 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $2,636 | $680 | Implemented |
TN0554 # 01 Y:1995 | 01 | 1995 | INSTALL SPECTRAL REFLECTORS / DELAMP | $5,277 | $19,760 | Not Implemented |
TN0248 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,966 | $375 | Implemented |
TN0248 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $500 | Implemented |
TN0248 # 06 Y:1985 | 06 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $967 | $0 | Implemented |
TN0248 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $354 | $399 | Not Implemented |
TN0248 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $1,044 | $750 | Implemented |
TN0248 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $1,628 | $800 | Implemented |