Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2302 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,679 $0 Not Implemented
UW2302 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $890 $1,114 Not Implemented
UW2302 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,949 $4,760 Not Implemented
UW2302 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $439 $0 Not Implemented
UW2210 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $595 $0 Implemented
UW2210 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,799 $2,329 Implemented
UW2210 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,861 $2,080 Implemented
UW2201 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,718 $0 Implemented
UW2201 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $11,363 Implemented
UW2201 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,277 $3,687 Implemented
OR0601 # 05 Y:2013 05 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $51,858 $112,345 Not Implemented
OR0601 # 08 Y:2013 08 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,164 $8,104 Implemented
OR0601 # 07 Y:2013 07 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,479 $35,500 Not Implemented
OR0601 # 06 Y:2013 06 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,546 $5,306 Implemented
OR0601 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,338 $1,616 Not Implemented
OR0601 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,167 $2,000 Not Implemented
OR0601 # 02 Y:2013 02 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $10,408 $3,874 Not Implemented
OR0601 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,114 $0 Implemented
OR0350 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $167 $600 Not Implemented
OR0350 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $2,030 $1,150 Not Implemented
OR0350 # 02 Y:1999 02 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,264 $16,230 Not Implemented
OR0350 # 01 Y:1999 01 1999 $23,000 $13,300 Not Implemented
OR0319 # 01 Y:1998 01 1998 $200,000 $2,500 Implemented
OR0319 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $833 $1,000 Implemented
OR0319 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $31,569 $931 Implemented