IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0310 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $323 $225 Not Implemented
MA0310 # 05 Y:1994 05 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,090 $0 Not Implemented
MA0310 # 04 Y:1994 04 1994 USE RADIANT HEATER FOR SPOT HEATING $5,208 $6,560 Implemented
MA0310 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $0 Implemented
MA0310 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,790 $23,672 Not Implemented
MA0310 # 08 Y:1994 08 1994 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,800 $0 Implemented
MA0310 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $30,270 $59,522 Implemented
MA0310 # 07 Y:1994 07 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,505 $2,697 Implemented
ME0142 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,604 $6,000 Not Implemented
ME0142 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,892 $56,000 Not Implemented
ME0142 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,939 $8,993 Not Implemented
ME0142 # 07 Y:1994 07 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,307 $1,947 Not Implemented
ME0142 # 09 Y:1994 09 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $572 $800 Not Implemented
ME0142 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,944 $17,480 Not Implemented
ME0142 # 10 Y:1994 10 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $583 $400 Implemented
ME0142 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,682 $250 Not Implemented
ME0142 # 08 Y:1994 08 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,524 $675 Not Implemented
ME0142 # 03 Y:1994 03 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,073 $3,075 Not Implemented
HO0083 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,879 $3,712 Implemented
HO0083 # 06 Y:1994 06 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,568 $600 Implemented
HO0083 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $918 $740 Not Implemented
HO0083 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $810 $500 Not Implemented
HO0083 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $304 $710 Not Implemented
HO0083 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,600 Implemented
CO0300 # 11 Y:1994 11 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $230 $460 Not Implemented