IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0666 # 02 Y:2014 02 2014 USE PHOTOCELL CONTROLS $4,405 $6,900 Implemented
AM0666 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,860 $4,450 Implemented
AM0666 # 04 Y:2014 04 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,308 $3,000 Implemented
AM0666 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $1,035 Implemented
AM0666 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,330 $11 Implemented
AM0666 # 07 Y:2014 07 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $450 $430 Implemented
AM0666 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $420 $500 Implemented
AM0666 # 01 Y:2014 01 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,980 $15,030 Implemented
SD0488 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $3,145 Not Implemented
SD0488 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,278 $3,660 Not Implemented
SD0488 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,681 $6,350 Implemented
SD0488 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,081 $14,125 Not Implemented
SD0488 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,362 $2,700 Implemented
SD0488 # 01 Y:2014 01 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,838 $7,262 Not Implemented
CO0689 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,950 $18,390 Not Implemented
CO0689 # 03 Y:2014 03 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,260 $1,500 Not Implemented
CO0689 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,310 $23,560 Not Implemented
CO0689 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,480 $4,200 Not Implemented
IP0027 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $4,976 $3,995 Not Implemented
IP0027 # 04 Y:2014 04 2014 INSTALL SET-BACK TIMERS $2,707 $236 Not Implemented
IP0027 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,818 $175 Not Implemented
IP0027 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,988 $280 Not Implemented
IP0027 # 07 Y:2014 07 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,453 $671 Not Implemented
IP0027 # 08 Y:2014 08 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $72,576 $12,435 Not Implemented
IP0027 # 09 Y:2014 09 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,685 $3,528 Not Implemented