IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3448 Prefabricated Metal Buildings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0343 # 08 Y:2025 08 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $293 $170 n/a
TT0343 # 07 Y:2025 07 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,402 $1,500 n/a
TT0343 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,652 $3,850 n/a
TT0343 # 05 Y:2025 05 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,446 $1,500 n/a
TT0343 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,788 $4,000 n/a
TT0343 # 03 Y:2025 03 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,284 $4,000 n/a
TT0343 # 02 Y:2025 02 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $51,928 $289,763 n/a
TT0343 # 01 Y:2025 01 2025 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $106,940 $8,000 n/a
TN0547 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,135 $0 Not Implemented
TN0547 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $131 $98 Implemented
TN0547 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $716 $468 Implemented
TN0547 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $1,800 Not Implemented
TN0547 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $5,800 Implemented
TN0508 # 01 Y:1994 01 1994 USE SYNTHETIC LUBRICANT $1,313 $0 Not Implemented
TN0508 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $33,000 $15,800 Not Implemented
TN0508 # 04 Y:1994 04 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,849 $240 Implemented
TN0508 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $250 Not Implemented
TN0508 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,160 $0 Implemented