IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0205 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $1,769 Implemented
IC0205 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,390 $4,470 Implemented
IC0205 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $30 Implemented
IC0205 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,439 $0 Implemented
BD0436 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $2,974 $1,500 Implemented
BD0386 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $2,692 $3,000 Implemented
BD0386 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,916 $850 Implemented
BD0386 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $221 $285 Implemented
BD0386 # 14 Y:2011 14 2011 USE EVAPORATION TO CONCENTRATE MATERIAL $6,567 $10,000 Implemented
BD0386 # 12 Y:2011 12 2011 INSTALL OCCUPANCY SENSORS $479 $450 Implemented
BD0386 # 09 Y:2011 09 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,876 $4,500 Implemented
BD0386 # 08 Y:2011 08 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,153 $6,680 Implemented
BD0386 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,419 $28,476 Implemented
BD0386 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,230 $3,000 Implemented
BD0386 # 07 Y:2011 07 2011 USE SYNTHETIC LUBRICANT $4,056 $1,500 Implemented
BD0261 # 16 Y:2004 16 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $54,392 $210,000 Implemented
BD0261 # 15 Y:2004 15 2004 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $49,566 $91,500 Implemented
BD0261 # 12 Y:2004 12 2004 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,000 $240 Implemented
BD0261 # 11 Y:2004 11 2004 USE EVAPORATION TO CONCENTRATE MATERIAL $1,331 $2 Implemented
BD0261 # 10 Y:2004 10 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $20,632 $400 Implemented
BD0261 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $159 $300 Implemented
BD0261 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $921 $722 Implemented
BD0261 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Implemented
BD0261 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $586 $150 Implemented
BD0261 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,039 $400 Implemented