Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2011 |
Principal Product | Heavy construction nuts and bolts |
NAICS | 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452 - Bolts, Nuts, Rivets, And Washers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 22,659,165 Pounds |
Production Hrs. Annual | 6,175 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $561,813 | 8,772,750 | kWh | $0.06 |
Electricity Fees | $27,739 | - | $ | - |
Natural Gas | $276,127 | 45,473 | MMBtu | $6.07 |
TOTAL ENERGY COSTS | $890,858 | |||
RECOMMENDED SAVINGS* | $96,658 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,609 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $19,582 Cost: $16,000 |
- | - | $19,582 | 3,225 | - | - | - | - | - | - |
- - kWh |
$19,582 3,225 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $19,115 Cost: $86,640 |
$(-8,460) | (-125,888) | $27,575 | 4,541 | - | - | - | - | - | - |
$(-8,460) (-125,888) kWh |
$27,575 4,541 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $18,419 Cost: $28,476 |
$18,419 | 274,087 | - | - | - | - | - | - | - | - |
$18,419 274,087 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS |
Savings: $11,046 Cost: $40,000 |
- | - | $11,046 | 1,819 | - | - | - | - | - | - |
- - kWh |
$11,046 1,819 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $5,230 Cost: $3,000 |
$5,230 | 84,089 | - | - | - | - | - | - | - | - |
$5,230 84,089 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,692 Cost: $3,000 |
- | - | $2,692 | 443 | - | - | - | - | - | - |
- - kWh |
$2,692 443 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $4,056 Cost: $1,500 |
$4,056 | 65,215 | - | - | - | - | - | - | - | - |
$4,056 65,215 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,153 Cost: $6,680 |
$3,153 | 46,917 | - | - | - | - | - | - | - | - |
$3,153 46,917 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,876 Cost: $4,500 |
- | - | $1,876 | 309 | - | - | - | - | - | - |
- - kWh |
$1,876 309 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,306 Cost: $50 |
$2,306 | 34,308 | - | - | - | - | - | - | - | - |
$2,306 34,308 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,916 Cost: $850 |
$1,916 | 28,471 | - | - | - | - | - | - | - | - |
$1,916 28,471 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $479 Cost: $450 |
$479 | 7,136 | - | - | - | - | - | - | - | - |
$479 7,136 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $221 Cost: $285 |
$159 | 2,365 | - | - | - | - | $26 | - | $36 | - |
$159 2,365 kWh |
- - MMBtu |
- - gal |
$26 - $ |
$36 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $6,567 Cost: $10,000 |
$(-1,293) | (-19,236) | - | - | $8,160 | 45,328 | $(-300) | - | - | - |
$(-1,293) (-19,236) kWh |
- - MMBtu |
$8,160 45,328 gal |
$(-300) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $96,658 Cost: $201,431 |
$25,965 | 397,464 | $62,771 | 10,338 | $8,160 | 45,328 | $(-274) | - | $36 | - | $25,965 397,464 kWh |
$62,771 10,338 MMBtu |
$8,160 45,328 gal |
$(-274) - $ |
$36 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,609 Cost: $58,741 |
$32,119 | 489,044 | $4,568 | 752 | $8,160 | 45,328 | $(-274) | - | $36 | - | $32,119 489,044 kWh |
$4,568 752 MMBtu |
$8,160 45,328 gal |
$(-274) - $ |
$36 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost |