Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsSIC | 345 | Screw Machine Products, Bolts, Etc. |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0054 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,402 | $28,100 | n/a |
MU0054 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,874 | $0 | n/a |
MU0054 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,876 | $1,801 | n/a |
MU0054 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,296 | $0 | n/a |
MU0054 # 06 Y:2024 | 06 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $118 | $272 | n/a |
MU0054 # 07 Y:2024 | 07 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $349 | $0 | n/a |
MU0054 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM TEMPERATURE | $6,955 | $0 | n/a |
UM0422 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,593 | $14,120 | Implemented |
UM0422 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,550 | $15,331 | Not Implemented |
UM0422 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,633 | $500 | Implemented |
UM0323 # 09 Y:2007 | 09 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,628 | $4,248 | Implemented |
UM0323 # 04 Y:2007 | 04 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,815 | $500 | Implemented |
UM0323 # 07 Y:2007 | 07 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,934 | $6,822 | Not Implemented |
UM0323 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,122 | $1,000 | Implemented |
UM0323 # 12 Y:2007 | 12 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $615 | $75 | Implemented |
UM0323 # 11 Y:2007 | 11 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $946 | $1,000 | Implemented |
UM0323 # 06 Y:2007 | 06 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,157 | $1,836 | Implemented |
UM0323 # 03 Y:2007 | 03 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,247 | $2,653 | Implemented |
UM0323 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,347 | $8,175 | Implemented |
UM0323 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $7,978 | $1,000 | Implemented |
UM0323 # 13 Y:2007 | 13 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $513 | $206 | Implemented |
UM0323 # 01 Y:2007 | 01 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,469 | $3,500 | Implemented |
UM0323 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,360 | $100 | Not Implemented |
UM0313 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,655 | $225 | Implemented |
UM0313 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,007 | $1,100 | Not Implemented |