IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0304 # 07 Y:2006 07 2006 COVER OPEN TANKS $810 $384 Implemented
UM0304 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,496 $1,000 Implemented
UM0304 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,372 $1,750 Implemented
UM0304 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,445 $875 Implemented
UM0304 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $9,510 $40,185 Not Implemented
UM0304 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,618 $2,500 Implemented
UM0304 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,663 $11,910 Not Implemented
UM0282 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,689 $5,736 Not Implemented
UM0282 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,587 $640 Not Implemented
UM0282 # 03 Y:2005 03 2005 COVER OPEN TANKS $2,342 $3,510 Not Implemented
UM0282 # 04 Y:2005 04 2005 MINIMIZE WATER USAGE $2,142 $1,262 Not Implemented
UM0282 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,738 $1,000 Not Implemented
UM0282 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,070 $1,938 Not Implemented
UM0282 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $476 $276 Not Implemented
UM0282 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $344 $225 Not Implemented
UM0165 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,996 $1,750 Implemented
UM0165 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,852 $13,583 Not Implemented
UM0165 # 05 Y:2000 05 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $26,506 $131,000 Not Implemented
UM0165 # 07 Y:2000 07 2000 FILTER AND REUSE HYDRAULIC OIL $37,145 $10,500 Not Implemented
UM0165 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,860 $0 Implemented
UM0165 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,237 $9,748 Implemented
UM0165 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $658 $750 Not Implemented
UM0148 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,069 $500 Not Implemented
UM0148 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $2,464 Implemented
UM0148 # 04 Y:1999 04 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $12,311 $40,000 Implemented