Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,045

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0321 # 04 Y:1999 04 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,555 $7,050 Implemented
ND0321 # 05 Y:1999 05 1999 OPTIMIZE PLANT POWER FACTOR $2,989 $12,575 Implemented
ND0321 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,378 $125 Not Implemented
ND0321 # 07 Y:1999 07 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $1,031 $3,000 Not Implemented
ND0321 # 08 Y:1999 08 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $730 $125 Implemented
ND0321 # 09 Y:1999 09 1999 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $203 $203 Not Implemented
ND0321 # 10 Y:1999 10 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $130 Implemented
ND0321 # 11 Y:1999 11 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $195 Not Implemented
MA0439 # 01 Y:1999 01 1999 INSTALL AN UNINTERUPTABLE POWER SUPPLY $120,000 $24,000 Not Implemented
MA0439 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $8,636 $1,360 Implemented
MA0439 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,629 $500 Implemented
MA0439 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $4,578 $10,705 Not Implemented
MA0439 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,295 Implemented
MA0439 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,116 $3,400 Not Implemented
MA0439 # 07 Y:1999 07 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $668 $1,244 Not Implemented
AS0247 # 01 Y:1999 01 1999 INSTALL SKYLIGHTS $7,511 $13,983 Not Implemented
AS0247 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $20 Implemented
AS0247 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $587 $1,275 Implemented
AS0247 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $226 $253 Implemented
AS0247 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,734 $4,593 Not Implemented
AS0247 # 06 Y:1999 06 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $18,060 $5,209 Not Implemented
AS0247 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,300 $120 Implemented
AS0247 # 08 Y:1999 08 1999 ADD ADDITIONAL PRODUCTION SHIFT $25,200 $24,000 Implemented
AR0147 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $1,129 $464 Not Implemented
AR0147 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $645 $60 Not Implemented