IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0548 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $87,415 $1,061,947 Implemented
AS0548 # 04 Y:2023 04 2023 INSTALL TIMERS AND/OR THERMOSTATS $3,626 $9,286 Implemented
AS0548 # 02 Y:2023 02 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $9,740 $208 Implemented
AS0548 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,351 $1,947 Implemented
AS0548 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,109 $5,233 Implemented
AS0456 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,727 $13,500 Not Implemented
AS0456 # 07 Y:2018 07 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,546 $0 Not Implemented
AS0456 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82,206 $176,400 Implemented
AS0456 # 03 Y:2018 03 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $46,649 $220,160 Not Implemented
AS0456 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,722 $320 Implemented
AS0456 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $30,900 $16,614 Not Implemented
AS0456 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,670 $51,257 Not Implemented
AS0281 # 08 Y:2000 08 2000 MODIFY STARTUP/SHUTDOWN TIMES $8,782 $9,600 Not Implemented
AS0281 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $456 $60 Implemented
AS0281 # 05 Y:2000 05 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $8,037 $8,525 Implemented
AS0281 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,476 $60 Not Implemented
AS0281 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,723 $4,950 Not Implemented
AS0281 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $31,250 $15,000 Not Implemented
AS0281 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $895 $2,709 Not Implemented
AS0281 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $581 $600 Not Implemented
AS0281 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,825 $3,713 Not Implemented
AS0247 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,300 $120 Implemented
AS0247 # 08 Y:1999 08 1999 ADD ADDITIONAL PRODUCTION SHIFT $25,200 $24,000 Implemented
AS0247 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,734 $4,593 Not Implemented
AS0247 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $20 Implemented