IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0258 # 02 Y:1988 02 1988 INSTALL AUTOMATIC STACK DAMPER $888 $650 Not Implemented
KU0258 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $604 $950 Implemented
KU0258 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $599 $600 Implemented
KU0258 # 05 Y:1988 05 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $198 $0 Implemented
KU0258 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $235 $0 Implemented
KU0258 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $376 Implemented
KU0258 # 01 Y:1988 01 1988 COVER OPEN TANKS $940 $200 Not Implemented
WI0031 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,808 $500 Implemented
WI0031 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,758 $3,500 Not Implemented
AT0108 # 12 Y:1988 12 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,171 $0 Implemented
AT0108 # 11 Y:1988 11 1988 INSTALL TURBULATORS $2,359 $600 Not Implemented
AT0108 # 10 Y:1988 10 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,101 $0 Implemented
AT0108 # 09 Y:1988 09 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,859 $10,000 Not Implemented
AT0108 # 08 Y:1988 08 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $1,957 $670 Implemented
AT0108 # 07 Y:1988 07 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,782 $0 Not Implemented
AT0108 # 06 Y:1988 06 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,541 $1,193 Implemented
AT0108 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,067 $1,200 Implemented
AT0108 # 04 Y:1988 04 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,681 $300 Implemented
AT0108 # 03 Y:1988 03 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,258 $4,500 Implemented
AT0108 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,433 $5,310 Implemented
AT0108 # 01 Y:1988 01 1988 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $41,053 $11,000 Implemented
WI0031 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $454 Not Implemented
WI0031 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,548 $2,500 Implemented
WI0031 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,507 $0 Not Implemented
WI0031 # 06 Y:1988 06 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,350 $2,300 Implemented