Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 345 | Screw Machine Products, Bolts, Etc. |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0045 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $7,255 | $126 | n/a |
TR0045 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,383 | $217,770 | n/a |
TR0045 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $454 | $640 | n/a |
AS0548 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,351 | $1,947 | Implemented |
AS0548 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $3,626 | $9,286 | Implemented |
AS0548 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,109 | $5,233 | Implemented |
AS0548 # 02 Y:2023 | 02 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $9,740 | $208 | Implemented |
AS0548 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,415 | $1,061,947 | Implemented |
DL0222 # 02 Y:2023 | 02 | 2023 | INSTALL SET-BACK TIMERS | $245 | $130 | Not Implemented |
DL0222 # 09 Y:2023 | 09 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,888 | $2,450 | Not Implemented |
DL0222 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,152 | $4,581 | Not Implemented |
DL0222 # 07 Y:2023 | 07 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,366 | $25,000 | Implemented |
DL0222 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,097 | $3,000 | Not Implemented |
DL0222 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $402 | $871 | Not Implemented |
DL0222 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $413 | $0 | Not Implemented |
DL0222 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $338 | $9,500 | Implemented |
DL0222 # 01 Y:2023 | 01 | 2023 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,009 | $42 | Not Implemented |
AM0863 # 01 Y:2023 | 01 | 2023 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $26,790 | $0 | Implemented |
AM0863 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $11,860 | $23,400 | Implemented |
AM0863 # 03 Y:2023 | 03 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $56,316 | $5,000 | Implemented |
AM0863 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $1,005 | $630 | Not Implemented |
AM0863 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $830 | $38 | Not Implemented |
AM0863 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $640 | $1,235 | Implemented |
AM0863 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $351 | $0 | Implemented |