IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 3451 Screw Machine Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0380 # 08 Y:2008 08 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,853 $13,200 Not Implemented
WV0380 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $2,626 $1,018 Implemented
WV0380 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $30 Implemented
WV0380 # 11 Y:2008 11 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,989 $1,550 Implemented
WV0380 # 12 Y:2008 12 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,891 $0 Implemented
WV0380 # 13 Y:2008 13 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,422 $225 Not Implemented
WV0380 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $18,045 $7,420 Not Implemented
UM0149 # 07 Y:1999 07 1999 EXPAND OPERATIONS INTO UNUSED SPACE $357,000 $714,000 Not Implemented
UM0149 # 06 Y:1999 06 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,500 $40,000 Implemented
UM0149 # 05 Y:1999 05 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,804 $0 Not Implemented
UM0149 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,107 $10,500 Not Implemented
UM0149 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,322 $1,500 Not Implemented
UM0149 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $618 $200 Implemented
UM0149 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $836 $500 Implemented
UD0168 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $506 $0 Implemented
UD0168 # 04 Y:1985 04 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $536 $0 Not Implemented
UD0168 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,217 $896 Not Implemented
UD0168 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $688 $300 Not Implemented
UD0168 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $2,610 $1,000 Implemented