Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 3451 | Screw Machine Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0380 # 08 Y:2008 | 08 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,853 | $13,200 | Not Implemented |
WV0380 # 09 Y:2008 | 09 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,626 | $1,018 | Implemented |
WV0380 # 10 Y:2008 | 10 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,058 | $30 | Implemented |
WV0380 # 11 Y:2008 | 11 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,989 | $1,550 | Implemented |
WV0380 # 12 Y:2008 | 12 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,891 | $0 | Implemented |
WV0380 # 13 Y:2008 | 13 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,422 | $225 | Not Implemented |
WV0380 # 01 Y:2008 | 01 | 2008 | OPTIMIZE PLANT POWER FACTOR | $18,045 | $7,420 | Not Implemented |
UM0149 # 07 Y:1999 | 07 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $357,000 | $714,000 | Not Implemented |
UM0149 # 06 Y:1999 | 06 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,500 | $40,000 | Implemented |
UM0149 # 05 Y:1999 | 05 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,804 | $0 | Not Implemented |
UM0149 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,107 | $10,500 | Not Implemented |
UM0149 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,322 | $1,500 | Not Implemented |
UM0149 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $200 | Implemented |
UM0149 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $836 | $500 | Implemented |
UD0168 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
UD0168 # 04 Y:1985 | 04 | 1985 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $536 | $0 | Not Implemented |
UD0168 # 03 Y:1985 | 03 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,217 | $896 | Not Implemented |
UD0168 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $688 | $300 | Not Implemented |
UD0168 # 01 Y:1985 | 01 | 1985 | INSTALL SET-BACK TIMERS | $2,610 | $1,000 | Implemented |