Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 3451 | Screw Machine Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1002 # 04 Y:2019 | 04 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,466 | $5,200 | Not Implemented |
UD1002 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $881 | $1,500 | Not Implemented |
UD1002 # 06 Y:2019 | 06 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,631 | $0 | Not Implemented |
UD1002 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,973 | $39,240 | Implemented |
UD1002 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,379 | $1,000 | Implemented |
UD1002 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,369 | $4,400 | Implemented |
UD1001 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,497 | $16,508 | Implemented |
UD1001 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $705 | $1,200 | Implemented |
UD1001 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,285 | $4,400 | Implemented |
UD0918 # 06 Y:2015 | 06 | 2015 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $11,416 | $23,545 | Not Implemented |
UD0918 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $537 | $1,000 | Implemented |
UD0918 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,773 | $4,785 | Implemented |
UD0918 # 07 Y:2015 | 07 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,952 | $45,000 | Not Implemented |
UD0918 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,325 | $0 | Implemented |
UD0918 # 04 Y:2015 | 04 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $58,864 | $75,499 | Implemented |
UD0918 # 03 Y:2015 | 03 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $4,208 | $1,050 | Not Implemented |
UD0918 # 02 Y:2015 | 02 | 2015 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,098 | $0 | Not Implemented |
UD0918 # 01 Y:2015 | 01 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,159 | $700 | Not Implemented |
WV0380 # 07 Y:2008 | 07 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,939 | $1,690 | Implemented |
WV0380 # 06 Y:2008 | 06 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,106 | $1,120 | Not Implemented |
WV0380 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,037 | $8,850 | Implemented |
WV0380 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,310 | $0 | Implemented |
WV0380 # 04 Y:2008 | 04 | 2008 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $6,055 | $4,950 | Not Implemented |
WV0380 # 03 Y:2008 | 03 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,429 | $3,300 | Not Implemented |
WV0380 # 14 Y:2008 | 14 | 2008 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $807 | $4,400 | Not Implemented |