Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

666

matching recommendations
Reset
SIC 3452 Bolts, Nuts, Rivets, And Washers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0398 # 04 Y:2001 04 2001 USE PHOTOCELL CONTROLS $840 $0 Implemented
AM0398 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $840 $0 Not Implemented
AM0398 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $200 Implemented
AM0398 # 07 Y:2001 07 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $310 $0 Implemented
AM0398 # 08 Y:2001 08 2001 PAY UTILITY BILLS ON TIME $295 $0 Implemented
AM0398 # 09 Y:2001 09 2001 WASH AND REUSE RAGS ON-SITE $170 $0 Not Implemented
AM0398 # 10 Y:2001 10 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $109 $0 Implemented
ND0366 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,569 $600 Not Implemented
ND0366 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,894 $600 Not Implemented
ND0366 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $350 Not Implemented
ND0366 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,250 $160 Implemented
AS0281 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $895 $2,709 Not Implemented
AS0281 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $581 $600 Not Implemented
AS0281 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,825 $3,713 Not Implemented
AS0281 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,723 $4,950 Not Implemented
AS0281 # 05 Y:2000 05 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $8,037 $8,525 Implemented
AS0281 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $456 $60 Implemented
AS0281 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,476 $60 Not Implemented
AS0281 # 08 Y:2000 08 2000 MODIFY STARTUP/SHUTDOWN TIMES $8,782 $9,600 Not Implemented
AS0281 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $31,250 $15,000 Not Implemented
UM0165 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,237 $9,748 Implemented
UM0165 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,860 $0 Implemented
UM0165 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,996 $1,750 Implemented
UM0165 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,852 $13,583 Not Implemented
UM0165 # 05 Y:2000 05 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $26,506 $131,000 Not Implemented