Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,639
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0061 # 02 Y:2024 | 02 | 2024 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $9,288 | $17,929 | n/a |
TR0061 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,083 | $551,388 | n/a |
TR0061 # 03 Y:2024 | 03 | 2024 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,219 | $4,350 | n/a |
TR0061 # 05 Y:2024 | 05 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,297 | $728 | n/a |
TR0061 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,588 | $55,200 | n/a |
TT0321 # 04 Y:2025 | 04 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,473 | $10,000 | n/a |
TT0321 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,594 | $2,250 | n/a |
TT0321 # 13 Y:2025 | 13 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $584 | $1,125 | n/a |
TT0321 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $71,296 | $345,600 | n/a |
TT0321 # 12 Y:2025 | 12 | 2025 | MINIMIZE WATER USAGE | $830 | $0 | n/a |
TT0321 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,076 | $645 | n/a |
TT0321 # 10 Y:2025 | 10 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,536 | $0 | n/a |
TT0321 # 11 Y:2025 | 11 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,173 | $0 | n/a |
TT0321 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,097 | $10,000 | n/a |
TT0321 # 07 Y:2025 | 07 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,896 | $1,450 | n/a |
TT0321 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,797 | $3,000 | n/a |
TT0321 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $28,035 | $28,125 | n/a |
TT0321 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,906 | $3,825 | n/a |
LE0586 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $17,326 | $1,600 | n/a |
LE0586 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,340 | $49,500 | n/a |
LE0586 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,427 | $35,960 | n/a |
LE0586 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,379 | $2,500 | n/a |
LE0586 # 01 Y:2025 | 01 | 2025 | INSTALL OCCUPANCY SENSORS | $1,582 | $70 | n/a |
WM0230 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,743 | $4,500 | n/a |
WM0230 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,667 | $900 | n/a |