IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,137

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0324 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $1,120 Implemented
TN0324 # 06 Y:1987 06 1987 ADJUST VENTS TO MINIMIZE ENERGY USE $967 $0 Implemented
TN0324 # 08 Y:1987 08 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $822 $1,360 Implemented
TN0324 # 09 Y:1987 09 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $192 Implemented
UD0247 # 02 Y:1988 02 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,816 $0 Implemented
UD0247 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $1,500 Implemented
UD0247 # 05 Y:1988 05 1988 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS $1,405 $76 Implemented
UD0220 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,276 $0 Implemented
UD0220 # 03 Y:1987 03 1987 MINIMIZE WATER USAGE $1,991 $300 Implemented
UD0218 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,049 $5,470 Implemented
UD0218 # 04 Y:1987 04 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,481 $0 Implemented
ST0065 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $0 Implemented
ST0065 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,556 $0 Implemented
ST0065 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,589 $537 Implemented
ST0065 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $337 $1,167 Implemented
ST0065 # 06 Y:1986 06 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $787 $1,775 Implemented
UD0209 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,634 $3,000 Implemented
UD0209 # 02 Y:1986 02 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,078 $500 Implemented
UD0209 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $50 Implemented
ST0055 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $571 Implemented
ST0055 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $731 $0 Implemented
ST0055 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,219 $10,500 Implemented
ST0055 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $417 $250 Implemented
ST0055 # 05 Y:1986 05 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $626 $0 Implemented
ST0055 # 06 Y:1986 06 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,030 $3,750 Implemented