IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0503 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,108 $45,000 Implemented
LE0503 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,254 $17,500 Implemented
LE0503 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,126 $15,100 Implemented
LE0503 # 05 Y:2021 05 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $56,981 $300,000 Implemented
LE0503 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,633 $50,000 Implemented
RU0124 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,108 $500 Implemented
RU0124 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,769 $0 Implemented
RU0124 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,576 $326 Implemented
RU0124 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $2,430 $800 Implemented
RU0124 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,332 $272 Implemented
RU0124 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,053 $0 Implemented
RU0092 # 06 Y:1990 06 1990 USE OPTIMUM THICKNESS INSULATION $9,910 $80,000 Implemented
RU0092 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $214 Implemented
RU0092 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,505 $500 Implemented
RU0092 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $34 Implemented
ST0055 # 05 Y:1986 05 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $626 $0 Implemented
ST0055 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $417 $250 Implemented
ST0055 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $834 $2,400 Implemented
ST0055 # 06 Y:1986 06 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,030 $3,750 Implemented
ST0055 # 03 Y:1986 03 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,219 $10,500 Implemented
ST0055 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $731 $0 Implemented
ST0055 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $571 Implemented
ST0002 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,150 $310 Implemented
ST0002 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $450 $537 Implemented
ST0002 # 10 Y:1984 10 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $296 $0 Implemented