IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0640 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,135 $10,165 Implemented
WV0640 # 12 Y:2023 12 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $66 $178 Implemented
WV0640 # 10 Y:2023 10 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,582 $5,558 Implemented
WV0640 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,011 $596 Implemented
WV0640 # 07 Y:2023 07 2023 DEVELOP A REPAIR/REPLACE POLICY $3,201 $1,563 Implemented
WV0640 # 06 Y:2023 06 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,905 $1,500 Implemented
WV0640 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $930 $135 Implemented
WV0640 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,002 $9,194 Implemented
LE0537 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,920 $245,000 Implemented
LE0537 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,096 $67,533 Implemented
LE0537 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $825 $570 Implemented
LE0537 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $167,234 $0 Implemented
LE0509 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,834 $2,500 Implemented
LE0509 # 03 Y:2021 03 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,755 $56,400 Implemented
LE0509 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,037 $8,000 Implemented
LE0509 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,633 $9,000 Implemented
WV0584 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $7,129 $675 Implemented
WV0584 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,028 $5,443 Implemented
WV0584 # 11 Y:2019 11 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $876 $358 Implemented
WV0584 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44,593 $129,500 Implemented
WV0584 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,899 $510 Implemented
WV0584 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $18,530 $6,283 Implemented
WV0584 # 07 Y:2019 07 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,503 $1,000 Implemented
LE0468 # 06 Y:2019 06 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $726,896 $16,000,000 Implemented
LE0468 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,988 $50,000 Implemented