IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2404 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $4,523 $13,000 n/a
UL2404 # 03 Y:2024 03 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $1,516 $0 n/a
UL2404 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $5,080 $13,000 n/a
UL2404 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $419 n/a
UL2404 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $840 n/a
UL2404 # 08 Y:2024 08 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $24,490 $4,200 n/a
UL2404 # 10 Y:2024 10 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $320,407 $3,432,213 n/a
UL2404 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $50,786 $33,072 n/a
UL2404 # 06 Y:2024 06 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $5,809 $43,234 n/a
UL2404 # 09 Y:2024 09 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,134 $16,300 n/a
UL2302 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $335 Not Implemented
UL2302 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,052 $8,500 Not Implemented
UL2302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,825 $960 Not Implemented
UL2302 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,425 $0 Not Implemented
UL2302 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $854 $975 Not Implemented
UL2302 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $149 $754 Not Implemented
UL2302 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $77,130 $820,000 Not Implemented
UL2302 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $30,686 $20,580 Not Implemented
UL2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,984 $83,246 Not Implemented
UL2207 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,180 $0 Not Implemented
UL2207 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,876 $0 Not Implemented
UL2207 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,845 $30,000 Not Implemented
UL2207 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,226 $2,377,313 Not Implemented
UL2207 # 06 Y:2022 06 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $178,671 $2,038,848 Not Implemented
UL2207 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,572 $18,120 Not Implemented