IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0689 # 15 Y:2004 15 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,012 $1,566 Not Implemented
UD0689 # 16 Y:2004 16 2004 USE RADIANT HEATER FOR SPOT HEATING $911 $1,436 Not Implemented
UD0689 # 17 Y:2004 17 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $58 Implemented
UD0689 # 18 Y:2004 18 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $155 $0 Implemented
UD0689 # 01 Y:2004 01 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $28,020 $48,560 Implemented
UD0689 # 02 Y:2004 02 2004 IMPROVE LUBRICATION PRACTICES $20,849 $16,000 Not Implemented
UD0689 # 03 Y:2004 03 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,424 $0 Implemented
UD0689 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,486 $23,704 Not Implemented
UD0689 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,050 $27,720 Not Implemented
UD0689 # 06 Y:2004 06 2004 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,597 $0 Not Implemented
UD0660 # 01 Y:2003 01 2003 DEVELOP STANDARD OPERATING PROCEDURES $280,000 $58,320 n/a
UD0660 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,779 $0 Implemented
UD0660 # 03 Y:2003 03 2003 FILTER AND REUSE HYDRAULIC OIL $19,375 $4,323 Not Implemented
UD0660 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $15,291 $7,000 Not Implemented
UD0660 # 05 Y:2003 05 2003 REDUCE VENTILATION AIR $8,388 $15,000 Implemented
UD0660 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,666 $1,124 Not Implemented
UD0660 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,568 $6,545 Not Implemented
UD0660 # 08 Y:2003 08 2003 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,026 $8,400 Implemented
UD0660 # 09 Y:2003 09 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,983 $14,150 Not Implemented
UD0660 # 10 Y:2003 10 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,648 $0 Not Implemented
UD0660 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $7,338 Not Implemented
UD0660 # 12 Y:2003 12 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,763 $3,318 Implemented
UD0660 # 13 Y:2003 13 2003 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,019 $4,158 Not Implemented
UD0660 # 14 Y:2003 14 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,707 $0 Not Implemented
UD0660 # 15 Y:2003 15 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,443 $1,000 Implemented