Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0538 # 04 Y:2016 | 04 | 2016 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $12,722 | $54,880 | Not Implemented |
SD0538 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $5,664 | $2,520 | Implemented |
SD0538 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,200 | $13,950 | Implemented |
SD0538 # 07 Y:2016 | 07 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $952 | $750 | Implemented |
SD0538 # 08 Y:2016 | 08 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $877 | $1,988 | Not Implemented |
UD0954 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,653 | $42 | Not Implemented |
UD0954 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,397 | $1,000 | Not Implemented |
UD0954 # 03 Y:2016 | 03 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $1,140 | $378 | Not Implemented |
UD0954 # 04 Y:2016 | 04 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $297 | $468 | Not Implemented |
UD0954 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,273 | $0 | Implemented |
UD0954 # 06 Y:2016 | 06 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $1,258 | $3,250 | Implemented |
UD0954 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $3,097 | $6,944 | Not Implemented |
UD0954 # 08 Y:2016 | 08 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $97 | $336 | Not Implemented |
UM0469 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,139 | $1,000 | Not Implemented |
UM0469 # 02 Y:2016 | 02 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,118 | $5,200 | Not Implemented |
UM0469 # 03 Y:2016 | 03 | 2016 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,961 | $20,000 | Not Implemented |
UM0469 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,415 | $1,500 | Not Implemented |
UM0469 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $601 | $1,000 | Not Implemented |
IP0065 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,132 | $8 | Implemented |
IP0065 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,539 | $77 | Implemented |
IP0065 # 03 Y:2016 | 03 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $2,844 | $181 | Implemented |
IP0065 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,873 | $422 | Implemented |
IP0065 # 05 Y:2016 | 05 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,760 | $93 | Implemented |
IP0065 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $483 | $198 | Implemented |
IP0065 # 07 Y:2016 | 07 | 2016 | MINIMIZE WATER USAGE | $9,506 | $6,223 | Not Implemented |