IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0295 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $80,138 $170,000 Implemented
UM0295 # 02 Y:2006 02 2006 OPTIMIZE PLANT POWER FACTOR $71,400 $75,000 Not Implemented
UM0295 # 03 Y:2006 03 2006 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $15,365 $1,130 Not Implemented
UM0295 # 04 Y:2006 04 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,656 $5,250 Not Implemented
UM0295 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,859 $2,400 Not Implemented
UM0295 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,040 $1,200 Implemented
UM0295 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,767 $13,877 Not Implemented
UM0295 # 08 Y:2006 08 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,259 $3,080 Not Implemented
UM0295 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $1,316 $1,860 Not Implemented
UM0295 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $878 $736 Not Implemented
SD0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,903 $13,350 Implemented
SD0375 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,954 $7,595 Not Implemented
SD0375 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,356 $14,145 Not Implemented
SD0375 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,793 $3,000 Implemented
SD0375 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $6,983 $537 Not Implemented
SD0375 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $2,079 $3,500 Not Implemented
SD0375 # 07 Y:2006 07 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,700 $18,500 Not Implemented
SD0375 # 08 Y:2006 08 2006 INSTALL EQUIPMENT TO MOVE PRODUCT $77,126 $70,000 Not Implemented
MS0277 # 01 Y:2005 01 2005 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $85,531 $33,636 Implemented
MS0277 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $30,473 $134 Not Implemented
MS0277 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,820 $25,845 Implemented
MS0277 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $10,885 $7,085 Not Implemented
MS0277 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,540 $6,210 Not Implemented
MS0277 # 06 Y:2005 06 2005 BURN WASTE OIL FOR HEAT $4,922 $9,172 Not Implemented
MS0277 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,263 $0 Implemented