IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0649 # 11 Y:2002 11 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $92 $0 Implemented
LM0030 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $35,921 $34,056 Not Implemented
LM0030 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $341,748 $600,000 Not Implemented
LM0030 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $789 $556 Not Implemented
LM0030 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,806 $350 Not Implemented
LM0030 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,427 $14,304 Not Implemented
LM0030 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,635 $17,700 Not Implemented
LM0030 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $115,143 $300 Implemented
LM0030 # 08 Y:2002 08 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $86,071 $175,000 Not Implemented
LM0030 # 09 Y:2002 09 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $600,000 $3,100 Not Implemented
LM0030 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,500 $700,000 Not Implemented
LM0030 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,080 $224 Not Implemented
LM0029 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $592 $735 Implemented
LM0029 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,200 $0 Implemented
LM0029 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,118 $500 Implemented
LM0029 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,628 $700 Implemented
LM0029 # 05 Y:2002 05 2002 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $200,000 $163,000 Not Implemented
LM0029 # 06 Y:2002 06 2002 DEVELOP STANDARD OPERATING PROCEDURES $40,500 $7,960 Not Implemented
LM0029 # 07 Y:2002 07 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $45,000 $16,500 Not Implemented
LM0029 # 08 Y:2002 08 2002 MODIFY WORKLOAD $247,361 $15,000 Not Implemented
LM0029 # 09 Y:2002 09 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $165,000 $350,000 Not Implemented
LM0029 # 10 Y:2002 10 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $7,500 $1,000 Implemented
LM0029 # 11 Y:2002 11 2002 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $7,500 $1,000 Implemented
UD0640 # 01 Y:2002 01 2002 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $181,200 $252,000 Not Implemented
UD0640 # 02 Y:2002 02 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $57,385 $82,200 Implemented