IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0482 # 01 Y:2001 01 2001 IMPROVE COMBUSTION CONTROL CAPABILITY $5,120 $10,000 Not Implemented
CO0482 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,800 $700 Not Implemented
CO0482 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $210 Implemented
CO0482 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $990 $370 Implemented
CO0482 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $1,500 Not Implemented
CO0482 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $60 Implemented
CO0482 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
CO0482 # 08 Y:2001 08 2001 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $16,420 $730 Not Implemented
CO0482 # 09 Y:2001 09 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $730 $2,000 Not Implemented
CO0482 # 10 Y:2001 10 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $64,110 $75,000 Not Implemented
UD0617 # 01 Y:2001 01 2001 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $90,000 $111,000 Implemented
UD0617 # 02 Y:2001 02 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $98,016 $60,000 Implemented
UD0617 # 03 Y:2001 03 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $20,174 $3,131 Not Implemented
UD0617 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,875 $0 Not Implemented
UD0617 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,578 $695 Implemented
UD0617 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,273 $260 Not Implemented
UD0617 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,073 $0 Not Implemented
SD0272 # 01 Y:2001 01 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,159 $5,200 Implemented
SD0272 # 02 Y:2001 02 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,052 $18,000 Not Implemented
SD0272 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,857 $120,000 Implemented
SD0272 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,213 $400 Implemented
SD0272 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,172 $7,600 Implemented
SD0272 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,078 $2,000 Implemented
SD0272 # 07 Y:2001 07 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,318 $2,550 Not Implemented
SD0272 # 08 Y:2001 08 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,288,713 $1,830,400 Not Implemented