IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,590

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0083 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,892 $25 Not Implemented
IA0083 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,531 $23,395 Implemented
IA0083 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $3,508 $0 Implemented
IA0083 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $2,573 $3,344 Implemented
IA0083 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,130 $0 Not Implemented
IA0083 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $986 $76 Implemented
UM0001 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,352 $15,040 Implemented
UM0001 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $3,815 $0 Implemented
UM0001 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,040 $34,841 Not Implemented
UM0001 # 04 Y:1994 04 1994 ADD AREA LIGHTING SWITCHES $4,248 $0 Implemented
UM0001 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $10,300 $18,603 Not Implemented
UM0001 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,772 $1,380 Not Implemented
UM0001 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,985 $1,000 Not Implemented
UM0001 # 08 Y:1994 08 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,932 $0 Implemented
UM0001 # 09 Y:1994 09 1994 REDUCE VENTILATION AIR $21,861 $25,000 Implemented
UM0001 # 10 Y:1994 10 1994 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $4,786 $1,700 Implemented
WV0014 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $417 $762 Implemented
WV0014 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $225 $4,980 Implemented
WV0014 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $84 $35 Not Implemented
WV0014 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,445 $2,200 Implemented
WV0014 # 05 Y:1993 05 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,814 $1,840 Not Implemented
WV0014 # 06 Y:1993 06 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $90,331 $5,000 Implemented
WV0014 # 07 Y:1993 07 1993 RECOVER WASTE HEAT FROM EQUIPMENT $439 $680 Implemented
WV0014 # 08 Y:1993 08 1993 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $6,989 $3,635 Implemented
IA0063 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,047 $82,940 Implemented