IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

411

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1049 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $115,254 $300,000 Implemented
UD1049 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,943 $20,000 Not Implemented
UD1049 # 02 Y:2023 02 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,224 $0 Not Implemented
UD1049 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $27,897 $0 Implemented
UD1049 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $38,668 $14,325 Not Implemented
UD1049 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,075 $952 Not Implemented
UD1049 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72,916 $709 Not Implemented
UD1049 # 10 Y:2023 10 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,436 $50 Not Implemented
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1049 # 11 Y:2023 11 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,994 $22,360 Not Implemented
UD1049 # 03 Y:2023 03 2023 REDUCE VENTILATION AIR $153,776 $45,000 Not Implemented
UD1028 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,408 $2,814 Implemented
UD1028 # 08 Y:2021 08 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $210 $600 Not Implemented
UD1028 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $0 Not Implemented
UD1028 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,623 $5,000 Not Implemented
UD1028 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $196 $0 Not Implemented
UD1028 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $782 $0 Implemented
UD1028 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,469 $4,200 Not Implemented
UD1028 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $3,730 $5,760 Not Implemented
UD1028 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $0 Not Implemented
WV0556 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,985 $222 Implemented
WV0556 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $7,284 $14,250 Implemented
WV0556 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,065 $9,139 Implemented
WV0556 # 12 Y:2018 12 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $763 $440 Implemented
WV0556 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $10,210 $20,465 Implemented