Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
141
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0671 # 13 Y:2024 | 13 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $768 | $176 | n/a |
WV0671 # 11 Y:2024 | 11 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,525 | $7,504 | n/a |
WV0671 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,906 | $5,200 | n/a |
WV0671 # 08 Y:2024 | 08 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,623 | $1,200 | n/a |
WV0671 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,594 | $38,917 | n/a |
WV0671 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $3,020 | $1,180 | n/a |
WV0671 # 06 Y:2024 | 06 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,058 | $5,330 | n/a |
WV0671 # 14 Y:2024 | 14 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $314 | $1,322 | n/a |
WV0671 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $3,901 | $6,364 | n/a |
WV0671 # 12 Y:2024 | 12 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $799 | $1,648 | n/a |
WV0671 # 10 Y:2024 | 10 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,918 | $2,094 | n/a |
WV0671 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,306 | $17,145 | n/a |
WV0671 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $16,714 | $10,679 | n/a |
WV0671 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,904 | $15,193 | n/a |
WV0640 # 06 Y:2023 | 06 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,905 | $1,500 | Implemented |
WV0640 # 07 Y:2023 | 07 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $3,201 | $1,563 | Implemented |
WV0640 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,011 | $596 | Implemented |
WV0640 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,135 | $10,165 | Implemented |
WV0640 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,002 | $9,194 | Implemented |
WV0640 # 10 Y:2023 | 10 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,582 | $5,558 | Implemented |
WV0640 # 12 Y:2023 | 12 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $66 | $178 | Implemented |
WV0640 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $43,563 | $209,750 | Not Implemented |
WV0640 # 09 Y:2023 | 09 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,907 | $11,135 | Not Implemented |
WV0640 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,670 | $212,780 | Not Implemented |
WV0640 # 01 Y:2023 | 01 | 2023 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $216,485 | $812,825 | Not Implemented |