IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0887 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,300 $0 Not Implemented
AM0887 # 03 Y:2023 03 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $3,790 $8,650 Not Implemented
AM0887 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,360 $303 Implemented
AM0887 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,340 $850 Implemented
AM0887 # 06 Y:2023 06 2023 USE SYNTHETIC LUBRICANT $860 $440 Not Implemented
AM0887 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $912 $1,783 Implemented
AM0887 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,830 $1,000 Implemented
MS0417 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $210,258 $2,164,995 Not Implemented
MS0417 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,886 $2,761 Implemented
MS0417 # 02 Y:2023 02 2023 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,264 $21,500 Not Implemented
MS0417 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,912 $3,171 Not Implemented
UL2302 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $77,130 $820,000 Not Implemented
UL2302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,825 $960 Not Implemented
UL2302 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $30,686 $20,580 Not Implemented
UL2302 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $335 Not Implemented
UL2302 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,052 $8,500 Not Implemented
UL2302 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,425 $0 Not Implemented
UL2302 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $149 $754 Not Implemented
UL2302 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $854 $975 Not Implemented
WV0640 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,670 $212,780 Not Implemented
WV0640 # 01 Y:2023 01 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $216,485 $812,825 Not Implemented
WV0640 # 03 Y:2023 03 2023 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $43,563 $209,750 Not Implemented
WV0640 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,002 $9,194 Implemented
WV0640 # 06 Y:2023 06 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,905 $1,500 Implemented
WV0640 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,135 $10,165 Implemented