Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
68
matching recommendationsSIC | 346 | Metal Forgings And Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0959 # 02 Y:2025 | 02 | 2025 | USE SYNTHETIC LUBRICANT | $4,748 | $60 | n/a |
AM0959 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,878 | $637,500 | n/a |
AM0959 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $83,930 | $15,300 | n/a |
AM0959 # 05 Y:2025 | 05 | 2025 | INSTALL SKYLIGHTS | $3,050 | $7,200 | n/a |
AM0959 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $98,900 | $5,262 | n/a |
AM0959 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $48,315 | $58,703 | n/a |
TT0329 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,983 | $500 | n/a |
TT0329 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $566 | $600 | n/a |
TT0329 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,666 | $2,490 | n/a |
TT0329 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,210 | $275 | n/a |
TT0329 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $77,572 | $478,110 | n/a |
TT0329 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,292 | $5,000 | n/a |
TT0329 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,117 | $120 | n/a |
TT0329 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,292 | $768 | n/a |
WV0681 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $308 | $675 | n/a |
WV0681 # 07 Y:2025 | 07 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,642 | $5,200 | n/a |
WV0681 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $1,989 | $4,797 | n/a |
WV0681 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,725 | $848 | n/a |
WV0681 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,385 | $5,940 | n/a |
WV0681 # 03 Y:2025 | 03 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,352 | $3,890 | n/a |
WV0681 # 02 Y:2025 | 02 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $9,972 | $8,140 | n/a |
WV0681 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,629 | $34,630 | n/a |
TT0333 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,569 | $3,000 | n/a |
TT0333 # 06 Y:2025 | 06 | 2025 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $3,915 | $1,640 | n/a |
TT0333 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,400 | $21,000 | n/a |