IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0556 # 14 Y:2018 14 2018 MINIMIZE WATER USAGE $350 $1,750 Not Implemented
WV0556 # 03 Y:2018 03 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,345 $5,620 Implemented
WV0556 # 12 Y:2018 12 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $763 $440 Implemented
WV0556 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $10,210 $20,465 Implemented
WV0556 # 10 Y:2018 10 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $864 $124 Implemented
WV0556 # 02 Y:2018 02 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,722 $126,000 Not Implemented
WV0556 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,044 $0 Implemented
WV0556 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $4,873 Not Implemented
WV0556 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,065 $9,139 Implemented
WV0556 # 01 Y:2018 01 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $51,079 $225,000 Not Implemented
WV0556 # 13 Y:2018 13 2018 INSULATE BARE EQUIPMENT $717 $604 Implemented
WV0556 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $7,284 $14,250 Implemented
WV0556 # 11 Y:2018 11 2018 DEVELOP A REPAIR/REPLACE POLICY $853 $758 Implemented
WV0556 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,985 $222 Implemented
UM0480 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,601 $28,500 n/a
UM0480 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,908 $2,500 n/a
UM0480 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $35,941 $20,000 n/a
UM0480 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,087 $6,000 n/a
UD0941 # 12 Y:2016 12 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,616 $11,550 Not Implemented
UD0941 # 09 Y:2016 09 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $930 $2,000 Not Implemented
UD0941 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $0 Implemented
UD0941 # 11 Y:2016 11 2016 USE RADIANT HEATER FOR SPOT HEATING $4,035 $3,850 Not Implemented
UD0941 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,067 $0 Implemented
UD0941 # 04 Y:2016 04 2016 DEVELOP A REPAIR/REPLACE POLICY $41 $285 Implemented
UD0941 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,441 $0 Implemented