IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
SIC 3463 Nonferrous Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0190 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,174 $15,667 Not Implemented
SD0190 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,878 $116,225 Not Implemented
SD0190 # 04 Y:1998 04 1998 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $17,334 $8,125 Not Implemented
SD0190 # 05 Y:1998 05 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,620 $1,350 Implemented
SD0190 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,072 $0 Implemented
SD0190 # 07 Y:1998 07 1998 INSTALL TIMERS AND/OR THERMOSTATS $788 $300 Not Implemented
SD0190 # 08 Y:1998 08 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,086 $4,856 Not Implemented
SD0190 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,443 $6,942 Implemented
SD0190 # 10 Y:1998 10 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $2,302 $2,150 Implemented
SD0190 # 11 Y:1998 11 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,500 $9,000 Implemented
SD0190 # 12 Y:1998 12 1998 RECYCLE WHITE WATER $445 $0 Not Implemented
SD0190 # 13 Y:1998 13 1998 $226,039 $560,000 Not Implemented
ND0278 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $209 $754 Implemented
ND0278 # 02 Y:1997 02 1997 ADD AREA LIGHTING SWITCHES $327 $200 Implemented
ND0278 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $129 $400 Not Implemented
ND0278 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $196 $450 Implemented
ND0278 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,214 $300 Not Implemented
ND0278 # 06 Y:1997 06 1997 RECOVER WASTE HEAT FROM EQUIPMENT $3,651 $1,560 Not Implemented
ND0278 # 07 Y:1997 07 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $195 $260 Not Implemented
ND0278 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,578 $2,925 Implemented
ND0278 # 09 Y:1997 09 1997 OPTIMIZE PLANT POWER FACTOR $778 $1,268 Not Implemented
ND0278 # 10 Y:1997 10 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $566 $394 Not Implemented
ND0278 # 11 Y:1997 11 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $242 $200 Implemented
ND0278 # 12 Y:1997 12 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $20 $0 Not Implemented
ND0278 # 13 Y:1997 13 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $396 $0 Not Implemented