IAC logo
IAC Assessment: ND0278
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0278
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1997
Principal Product Machined automotive parts
NAICS n/a
SIC 3463 - Nonferrous Forgings
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 75,000
Annual Production 35,000,000 Pieces
Production Hrs. Annual 6,428
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $265,320 7,792,497 kWh $0.03
Electricity Demand $170,255 14,905 kW-months/year $11.42
Natural Gas $8,851 2,100 MMBtu $4.21
TOTAL ENERGY COSTS $453,959
RECOMMENDED SAVINGS* $25,545 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,354
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$209
Cost:
$754
$151 4,396 $58 8 - - - - - - - - - - - - - - $151
4,396
kWh
$58
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$327
Cost:
$200
$327 9,672 - - - - - - - - - - - - - - - - $327
9,672
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$129
Cost:
$400
$129 3,810 - - - - - - - - - - - - - - - - $129
3,810
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$196
Cost:
$450
$160 3,224 $36 5 - - - - - - - - - - - - - - $160
3,224
kWh
$36
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,214
Cost:
$300
$2,214 62,427 - - - - - - - - - - - - - - - - $2,214
62,427
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,651
Cost:
$1,560
- - - - - - $3,651 824 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,651
824
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$195
Cost:
$260
- - - - - - $195 28 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$195
28
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,578
Cost:
$2,925
$2,924 89,390 $1,654 143 - - - - - - - - - - - - - - $2,924
89,390
kWh
$1,654
143
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$778
Cost:
$1,268
- - - - $778 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$778
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$566
Cost:
$394
- - - - - - $566 128 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$566
128
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$242
Cost:
$200
$242 7,034 - - - - - - - - - - - - - - - - $242
7,034
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$20
Cost:
-
$20 586 - - - - - - - - - - - - - - - - $20
586
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$396
Cost:
-
- - - - - - - - - - - - $396 1 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$396
1
lb
-
-
$
-
-
$
14: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$73
Cost:
$90
- - - - - - - - - - - - - - $73 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$73
-
$
-
-
$
15: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$4,950
Cost:
$1,000
- - - - - - - - - - $4,950 7,500 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$4,950
7,500
gal
-
-
lb
-
-
$
-
-
$
16: 4.3110 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$461
Cost:
-
- - - - - - - - - - - - - - - - $461 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
-
-
$
$461
-
$
17: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,628
Cost:
$720
- - - - - - - - - - - - - - $2,628 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
lb
$2,628
-
$
-
-
$
18: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,160
Cost:
$480
- - - - - - - - - - - - $2,160 3 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$2,160
3
lb
-
-
$
-
-
$
19: 3.8221 USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) Savings:
$920
Cost:
-
- - - - - - - - - - $920 124 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$920
124
gal
-
-
lb
-
-
$
-
-
$
20: 3.7393 IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION Savings:
$852
Cost:
$3,000
- - - - - - - - $852 600,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$852
600,000
Tgal
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,545
Cost:
$14,001
$6,167 180,539 $1,748 156 $778 - $4,412 980 $852 600,000 $5,870 7,624 $2,556 4 $2,701 - $461 - $6,167
180,539
kWh
$1,748
156
kW-months/year
$778
-
$
$4,412
980
MMBtu
$852
600,000
Tgal
$5,870
7,624
gal
$2,556
4
lb
$2,701
-
$
$461
-
$
TOTAL IMPLEMENTED Savings:
$11,354
Cost:
$8,529
$3,804 113,716 $1,748 156 - - - - $852 600,000 $4,950 7,500 - - - - - - $3,804
113,716
kWh
$1,748
156
kW-months/year
-
-
$
-
-
MMBtu
$852
600,000
Tgal
$4,950
7,500
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Primary Product