Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
619
matching recommendationsSIC | 3465 | Automotive Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0887 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,300 | $0 | Not Implemented |
AM0887 # 03 Y:2023 | 03 | 2023 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $3,790 | $8,650 | Not Implemented |
AM0887 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,360 | $303 | Implemented |
AM0887 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,340 | $850 | Implemented |
AM0887 # 06 Y:2023 | 06 | 2023 | USE SYNTHETIC LUBRICANT | $860 | $440 | Not Implemented |
AM0887 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $912 | $1,783 | Implemented |
AM0887 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,830 | $1,000 | Implemented |
MS0417 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,886 | $2,761 | n/a |
MS0417 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $210,258 | $2,164,995 | n/a |
MS0417 # 02 Y:2023 | 02 | 2023 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $2,264 | $21,500 | n/a |
MS0417 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,912 | $3,171 | n/a |
UL2302 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,425 | $0 | n/a |
UL2302 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $149 | $754 | n/a |
UL2302 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $854 | $975 | n/a |
UL2302 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,052 | $8,500 | n/a |
UL2302 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $30,686 | $20,580 | n/a |
UL2302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,825 | $960 | n/a |
UL2302 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $427 | $335 | n/a |
UL2302 # 08 Y:2023 | 08 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $77,130 | $820,000 | n/a |
MU0008 # 03 Y:2022 | 03 | 2022 | USE OPTIMUM TEMPERATURE | $168 | $0 | Implemented |
MU0008 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,317 | $2,520 | Implemented |
MU0008 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $263 | $210 | Not Implemented |
MU0008 # 05 Y:2022 | 05 | 2022 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $11,502 | $0 | Not Implemented |
MU0008 # 04 Y:2022 | 04 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,790 | $580 | Not Implemented |
MU0002 # 05 Y:2022 | 05 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $701 | $0 | Implemented |