Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
350
matching recommendationsSIC | 3465 | Automotive Stampings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0415 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $21,876 | $30,800 | Not Implemented |
WV0415 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,767 | $1,503 | Implemented |
WV0415 # 04 Y:2010 | 04 | 2010 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,296 | $7,820 | Implemented |
WV0415 # 07 Y:2010 | 07 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,621 | $2,000 | Implemented |
WV0415 # 01 Y:2010 | 01 | 2010 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $86,422 | $15,000 | Not Implemented |
WV0415 # 03 Y:2010 | 03 | 2010 | REDUCE VENTILATION AIR | $18,153 | $5,000 | Not Implemented |
WV0415 # 12 Y:2010 | 12 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,032 | $1,312 | Implemented |
WV0415 # 08 Y:2010 | 08 | 2010 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,733 | $700 | Implemented |
WV0415 # 09 Y:2010 | 09 | 2010 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $4,603 | $5,265 | Not Implemented |
WV0415 # 10 Y:2010 | 10 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,852 | $884 | Implemented |
WV0415 # 11 Y:2010 | 11 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,398 | $4,490 | Implemented |
WV0415 # 05 Y:2010 | 05 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $12,353 | $34,050 | Not Implemented |
UM0369 # 06 Y:2010 | 06 | 2010 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $11,181 | $2,254 | Implemented |
UM0369 # 10 Y:2010 | 10 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,010 | $1,300 | Implemented |
UM0369 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $695 | $2,500 | Implemented |
UM0369 # 08 Y:2010 | 08 | 2010 | INSULATE FEEDWATER TANK | $1,281 | $1,449 | Not Implemented |
UM0369 # 05 Y:2010 | 05 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,318 | $21,700 | Implemented |
UM0369 # 09 Y:2010 | 09 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,164 | $1,000 | Implemented |
UM0369 # 02 Y:2010 | 02 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $4,068 | $10 | Not Implemented |
UM0369 # 07 Y:2010 | 07 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,409 | $1,874 | Not Implemented |
UM0369 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $8,910 | $1,680 | Implemented |
UM0369 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $443 | $2,210 | Not Implemented |
BD0378 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $361 | $425 | Not Implemented |
BD0378 # 03 Y:2010 | 03 | 2010 | USE PHOTOCELL CONTROLS | $1,578 | $835 | n/a |
BD0378 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,696 | $100 | Not Implemented |