Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsSIC | 3466 | Crowns And Closures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0671 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $16,714 | $10,679 | n/a |
WV0671 # 13 Y:2024 | 13 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $768 | $176 | n/a |
WV0671 # 06 Y:2024 | 06 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,058 | $5,330 | n/a |
WV0671 # 08 Y:2024 | 08 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,623 | $1,200 | n/a |
WV0671 # 11 Y:2024 | 11 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,525 | $7,504 | n/a |
WV0671 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,306 | $17,145 | n/a |
WV0671 # 12 Y:2024 | 12 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $799 | $1,648 | n/a |
WV0671 # 10 Y:2024 | 10 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,918 | $2,094 | n/a |
WV0671 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,594 | $38,917 | n/a |
WV0671 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $3,901 | $6,364 | n/a |
WV0671 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,906 | $5,200 | n/a |
WV0671 # 14 Y:2024 | 14 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $314 | $1,322 | n/a |
WV0671 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $3,020 | $1,180 | n/a |
WV0671 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,904 | $15,193 | n/a |
LE0537 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,096 | $67,533 | Implemented |
LE0537 # 06 Y:2023 | 06 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $23,891 | $70,000 | Not Implemented |
LE0537 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,193 | $7,500 | Not Implemented |
LE0537 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,920 | $245,000 | Implemented |
LE0537 # 04 Y:2023 | 04 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $6,501 | $7,500 | Not Implemented |
LE0537 # 03 Y:2023 | 03 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $825 | $570 | Implemented |
LE0537 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,776 | $15,000 | Not Implemented |
LE0537 # 01 Y:2023 | 01 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $167,234 | $0 | Implemented |
UL2205 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80,954 | $524,616 | Not Implemented |
UL2205 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $83,199 | $100,000 | Not Implemented |
UL2205 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,490 | $11,516 | Implemented |