Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsSIC | 3466 | Crowns And Closures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0371 # 05 Y:2009 | 05 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $366 | $417 | Implemented |
SF0371 # 06 Y:2009 | 06 | 2009 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $730 | $1,240 | Implemented |
SF0371 # 07 Y:2009 | 07 | 2009 | INSTALL OCCUPANCY SENSORS | $1,052 | $2,064 | Implemented |
SF0371 # 08 Y:2009 | 08 | 2009 | INSULATE BARE EQUIPMENT | $598 | $1,218 | Not Implemented |
SF0371 # 09 Y:2009 | 09 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,056 | $15,973 | Implemented |
SF0371 # 10 Y:2009 | 10 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,741 | $38,621 | Not Implemented |
SF0371 # 11 Y:2009 | 11 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,353 | $133,125 | Implemented |
WV0355 # 01 Y:2007 | 01 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $187,442 | $70,000 | Not Implemented |
WV0355 # 02 Y:2007 | 02 | 2007 | INSULATE BARE EQUIPMENT | $99,024 | $30,573 | Not Implemented |
WV0355 # 03 Y:2007 | 03 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $63,700 | $65,000 | Implemented |
WV0355 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $47,113 | $11,460 | Not Implemented |
WV0355 # 05 Y:2007 | 05 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $24,887 | $25,000 | Implemented |
WV0355 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,682 | $6,140 | Implemented |
WV0355 # 07 Y:2007 | 07 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,171 | $10,940 | Not Implemented |
WV0355 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,654 | $39,137 | Implemented |
WV0355 # 09 Y:2007 | 09 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,370 | $5,220 | Implemented |
WV0355 # 10 Y:2007 | 10 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,946 | $4,000 | Implemented |
WV0355 # 11 Y:2007 | 11 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,728 | $3,500 | Not Implemented |
WV0355 # 12 Y:2007 | 12 | 2007 | USE SYNTHETIC LUBRICANT | $5,378 | $2,150 | Not Implemented |
WV0355 # 13 Y:2007 | 13 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $5,152 | $1,973 | Implemented |
WV0355 # 14 Y:2007 | 14 | 2007 | BURN WASTE OIL FOR HEAT | $4,426 | $3,700 | Not Implemented |
WV0355 # 15 Y:2007 | 15 | 2007 | INSTALL OCCUPANCY SENSORS | $2,673 | $2,890 | Implemented |
WV0355 # 16 Y:2007 | 16 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,450 | $0 | Implemented |
WV0355 # 17 Y:2007 | 17 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,148 | $2,700 | Implemented |
SF0077 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,092 | $2,932 | Not Implemented |