IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
SIC 3466 Crowns And Closures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0371 # 05 Y:2009 05 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $366 $417 Implemented
SF0371 # 06 Y:2009 06 2009 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $730 $1,240 Implemented
SF0371 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $1,052 $2,064 Implemented
SF0371 # 08 Y:2009 08 2009 INSULATE BARE EQUIPMENT $598 $1,218 Not Implemented
SF0371 # 09 Y:2009 09 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,056 $15,973 Implemented
SF0371 # 10 Y:2009 10 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,741 $38,621 Not Implemented
SF0371 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,353 $133,125 Implemented
WV0355 # 01 Y:2007 01 2007 USE RADIANT HEATER FOR SPOT HEATING $187,442 $70,000 Not Implemented
WV0355 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $99,024 $30,573 Not Implemented
WV0355 # 03 Y:2007 03 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $63,700 $65,000 Implemented
WV0355 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $47,113 $11,460 Not Implemented
WV0355 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,887 $25,000 Implemented
WV0355 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,682 $6,140 Implemented
WV0355 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,171 $10,940 Not Implemented
WV0355 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,654 $39,137 Implemented
WV0355 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,370 $5,220 Implemented
WV0355 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,946 $4,000 Implemented
WV0355 # 11 Y:2007 11 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,728 $3,500 Not Implemented
WV0355 # 12 Y:2007 12 2007 USE SYNTHETIC LUBRICANT $5,378 $2,150 Not Implemented
WV0355 # 13 Y:2007 13 2007 DEVELOP A REPAIR/REPLACE POLICY $5,152 $1,973 Implemented
WV0355 # 14 Y:2007 14 2007 BURN WASTE OIL FOR HEAT $4,426 $3,700 Not Implemented
WV0355 # 15 Y:2007 15 2007 INSTALL OCCUPANCY SENSORS $2,673 $2,890 Implemented
WV0355 # 16 Y:2007 16 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,450 $0 Implemented
WV0355 # 17 Y:2007 17 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,148 $2,700 Implemented
SF0077 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,092 $2,932 Not Implemented