Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
460
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0107 # 03 Y:1991 | 03 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,338 | $2,250 | Implemented |
WI0107 # 04 Y:1991 | 04 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $3,427 | $2,100 | Implemented |
WI0107 # 05 Y:1991 | 05 | 1991 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $765 | $0 | Implemented |
WI0107 # 06 Y:1991 | 06 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $332 | $0 | Implemented |
WI0107 # 07 Y:1991 | 07 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $72 | $160 | Implemented |
WI0107 # 08 Y:1991 | 08 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,042 | $5,000 | Implemented |
RU0092 # 01 Y:1990 | 01 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $261 | $34 | Implemented |
RU0092 # 02 Y:1990 | 02 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,505 | $500 | Implemented |
RU0092 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,267 | $214 | Implemented |
RU0092 # 06 Y:1990 | 06 | 1990 | USE OPTIMUM THICKNESS INSULATION | $9,910 | $80,000 | Implemented |
WI0066 # 03 Y:1989 | 03 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $2,703 | $750 | Implemented |
WI0066 # 05 Y:1989 | 05 | 1989 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,710 | $0 | Implemented |
WI0066 # 06 Y:1989 | 06 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,350 | $450 | Implemented |
WI0066 # 08 Y:1989 | 08 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $573 | $3,346 | Implemented |
WI0066 # 10 Y:1989 | 10 | 1989 | INSTALL SET-BACK TIMERS | $481 | $400 | Implemented |
WI0066 # 11 Y:1989 | 11 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $197 | $500 | Implemented |
UD0299 # 02 Y:1989 | 02 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $900 | $0 | Implemented |
UD0299 # 03 Y:1989 | 03 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,667 | $750 | Implemented |
UD0299 # 04 Y:1989 | 04 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $889 | $750 | Implemented |
UD0299 # 05 Y:1989 | 05 | 1989 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,588 | $1,720 | Implemented |
OK0285 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,402 | $3,870 | Implemented |
OK0285 # 02 Y:1989 | 02 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $486 | $872 | Implemented |
OK0285 # 03 Y:1989 | 03 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,367 | $0 | Implemented |
OK0285 # 04 Y:1989 | 04 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,072 | $98 | Implemented |
OK0285 # 05 Y:1989 | 05 | 1989 | INSULATE BARE EQUIPMENT | $2,244 | $1,161 | Implemented |