IAC Assessment: WI0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1989
Principal Product HYDRAULIC HOSE COUPLINGS
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 30,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $277,381 4,223,036 kWh $0.07
Natural Gas $27,667 7,514 MMBtu $3.68
TOTAL ENERGY COSTS $305,048
RECOMMENDED SAVINGS* $28,537 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,014
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$12,199
Cost:
-
$12,199 185,815 - - - - $12,199
185,815
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,836
Cost:
-
$5,256 - - - $(-420) - $5,256
-
kWh
-
-
MMBtu
$(-420)
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,703
Cost:
$750
- - $2,703 850 - - -
-
kWh
$2,703
850
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,138
Cost:
$750
- - $2,138 792 - - -
-
kWh
$2,138
792
MMBtu
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$2,710
Cost:
-
- - $2,710 - - - -
-
kWh
$2,710
-
MMBtu
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,350
Cost:
$450
$(-62) (-879) $1,412 527 - - $(-62)
(-879)
kWh
$1,412
527
MMBtu
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$935
Cost:
$5,000
- - $935 346 - - -
-
kWh
$935
346
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$573
Cost:
$3,346
$573 8,792 - - - - $573
8,792
kWh
-
-
MMBtu
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$415
Cost:
$2,000
- - $415 154 - - -
-
kWh
$415
154
MMBtu
-
-
$
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$481
Cost:
$400
$481 7,327 - - - - $481
7,327
kWh
-
-
MMBtu
-
-
$
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$197
Cost:
$500
- - $297 110 $(-100) - -
-
kWh
$297
110
MMBtu
$(-100)
-
$
TOTAL RECOMMENDED Savings:
$28,537
Cost:
$13,196
$18,447 201,055 $10,610 2,779 $(-520) - $18,447
201,055
kWh
$10,610
2,779
MMBtu
$(-520)
-
$
TOTAL IMPLEMENTED Savings:
$8,014
Cost:
$5,446
$992 15,240 $7,122 1,487 $(-100) - $992
15,240
kWh
$7,122
1,487
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes