IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

979

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0259 # 01 Y:1988 01 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $182 $0 Implemented
UD0259 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $680 $0 Not Implemented
UD0259 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $64 Implemented
CO0109 # 01 Y:1987 01 1987 RECOVER WASTE HEAT FROM EQUIPMENT $867 $1,200 Not Implemented
CO0109 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $573 $540 Implemented
CO0109 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $683 $900 Implemented
CO0109 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,672 $45 Implemented
CO0109 # 05 Y:1987 05 1987 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,517 $250 Implemented
CO0109 # 06 Y:1987 06 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,069 $500 Implemented
CO0109 # 07 Y:1987 07 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,647 $2,000 Implemented
CO0109 # 08 Y:1987 08 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $796 Implemented
UD0220 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,276 $0 Implemented
UD0220 # 02 Y:1987 02 1987 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $6,871 $10,000 Not Implemented
UD0220 # 03 Y:1987 03 1987 MINIMIZE WATER USAGE $1,991 $300 Implemented
UD0220 # 04 Y:1987 04 1987 HEAT WATER WITH EXHAUST HEAT $2,530 $2,000 Not Implemented
ST0065 # 01 Y:1986 01 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,024 $0 Implemented
ST0065 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,556 $0 Implemented
ST0065 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,589 $537 Implemented
ST0065 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,060 $1,449 Not Implemented
ST0065 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $337 $1,167 Implemented
ST0065 # 06 Y:1986 06 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $787 $1,775 Implemented
ST0065 # 07 Y:1986 07 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $11,073 $10,000 Not Implemented
ST0065 # 08 Y:1986 08 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,912 $3,500 Not Implemented
ST0065 # 09 Y:1986 09 1986 INSTALL STORM WINDOWS AND DOORS $2,355 $1,700 Not Implemented
UD0209 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,634 $3,000 Implemented